EXCAVATION OF A GARAGE WHILE REPLACING THE EXISTING BRICK PILLAR WITH A CONCRETE COLUMN IN MAGHTAB, MALTA

Excavation of a garage to introduce a split level to take advantage of a difference in road levels while maintaining the existing structure overhead. Works also included a reservoir, foundation and the replacement of the existing brick pillar with a reinforced concrete column that was cast-in-situ.